Fictional example · Southpoint Industrial Park
From a question to a reviewable proposal
Scripted example · Complete answer
Your task
Cross-check the rent roll, T-12, and OM for inconsistencies.
EQUIRE’s proposed answer
I found 2 proposed conflict resolutions that still need human approval:
- Total SF: 182,350 (Rent Roll, 99%) vs 183,000 (OM, 85%). Proposal: use 182,350 because the suite-level rent roll is more granular.
- Year Built: 2018 (Appraisal) vs 2019 (OM). Proposal: use 2018 based on the certificate-of-occupancy evidence.
- Operating statement tie-out: base rent plus expense recoveries equals EGI, and EGI less operating expenses equals $2,888,349 NOI.
I can prepare the proposals, but a reviewer must approve them before the current edits are released.
Answer source references
- Rent Roll
Rent Roll · A5:H12
- T-12 Operating Statement
T-12 · B8:C22
- Offering Memorandum
Page 12
- Appraisal
Page 18
Published source references only. Original files and excerpts are unavailable; source-linked does not mean independently verified.
Proposed changes · Human review required
- Total SF
- 182,350 SF
- Year Built
- 2018
These are unresolved current edits. A reviewer must decide before a new release; the released snapshot remains separate.